Leave Tioga Town Center, Bike Works Parking Lot, 8:10 a.m. for ride of not more than two hours.
We'll do our best to stay off nasty big roads. Average 18mph effort. We haven't had a lot of actual students out (not unusual until time changes) so expect character of the ride to change according to who shows. If someone shows who needs to learn how to ride group, we'll accommodate them, then maybe do a hare and hound or something so everyone can mostly ride together. If no one new shows, we'll do our usual escalating tempo, with Knowland- and Staras-inspired shenanigans as the end draws near.
VERY IMPORTANT: The "finish" line if we come back up Newberry for the last mile or two is the 50 MPH LIMIT SIGN. This gives us time to cool down a mile before the finish and keeps us from trying to run the light to be the first back to Tioga. Sprinting through the light at Newberry/241 is forbidden on all Developers rides, green or red no matter.
James T
225-3585